There are three elements of the Connection Plan budget: capital
improvements, operating expenses and resources.
Capital Improvement Costs
are Remarkably Low
Enough
information was available to estimate most recommended capital
improvements. The chart below provides a listing of nineteen project
cost estimations. These projects are divided into three groups, based on
level of priority. Total cost for the 19 projects is about $8.89
million. First priority projects are about $4.3 million. Second priority
projects are about $2 million, and third priority projects are about
$2.6 million. The table further breaks out required costs and
"discretionary" costs," those that are recommended but
could be eliminated if resources are heavily constrained.
In
some cases, projects have not been defined in specific enough terms yet
to provide a reliable cost estimate. These projects include:
* Relocate fairgrounds
* Industrial park basic
improvements
* River Walk, downtown
segment and rail bridge-wildlife refuge segment
* Downtown alleys, library
park
* West Visitor parking lot,
property acquisition
* Farmers market
* Airport runway extension
|
Project
Number |
Description |
Total
Estimated
Project
Cost |
Basic Costs |
Discretionary
Costs |
| Priority
1 |
|
|
|
|
| 1.1 |
Visitors
Center parking lot enhancements |
$483,700 |
$455,900 |
27,800 |
| 1.2 |
Entry at
Kootenai/95 |
40,000 |
25,000 |
15,000 |
| 1.3 |
Entry at
Main/95 |
25,000 |
25,000 |
0 |
| 1.4 |
Main Street
enhancement |
386,000 |
337,200 |
48,800 |
| 1.5 |
South Hill |
1,432,936 |
1,124,436 |
308,500 |
| 1.6 |
FY 2002
Airport improvement program |
1,136,000 |
1,136,000 |
0 |
| 1.7 |
Signal at
Tamarack |
219,100 |
219,100 |
0 |
| 1.8 |
Pedestrian
underpass |
560,800 |
560,800 |
0 |
|
Priority 1 Estimated Total
Project Costs: |
$4,283,536 |
$3,883,436 |
$400,100 |
| Priority
2 |
|
|
|
|
| 2.1 |
Extend
Bonner Port Street (Library Street) |
136,270 |
135,500 |
770 |
| 2.2 |
Kootenai
Street enhancement |
470,700 |
456,500 |
14,200 |
| 2.3 |
River Walk:
$4-5/square foot @ 8 ft. wide |
358,700 |
345,300 |
13,400 |
| 2.4 |
Airport
runway extension (600 feet) |
200,000 |
200,000 |
0 |
| 2.5 |
River Walk:
$4-5/square foot @ 8 ft. wide |
|
|
|
|
2.5.1 |
Dike, KRI to
Florida St., 745 linear feet |
29,800 |
23,840 |
5,960 |
|
2.5.2 |
KRI River
promenade, 760 linear feet |
30,400 |
24,320 |
6,080 |
|
2.5.3 |
Underpass
(See project 1.7) |
|
|
|
|
2.5.4 |
Through
Downtown parking lot |
no estimate |
|
|
|
2.5.5 |
Riverside,
Main to Railroad, 900 linear feet |
36,000 |
28,800 |
7,200 |
|
2.5.6 |
Riverside,
Railroad to refuge |
no estimate |
|
|
|
2.5.7 |
95 Bridge |
no estimate |
|
|
|
2.5.8 |
North of Bridge, east
trail, 950 linear feet |
38,000 |
30,400 |
7,600 |
|
2.5.9 |
North of Bridge, west
trail, 1,600 linear feet |
64,000 |
51,200 |
12,800 |
| 2.6 |
Employee parking |
164,900 |
159,400 |
5,500 |
| 2.7 |
First Street enhancement |
338,600 |
321,000 |
17,600 |
| 2.8 |
Arizona Pedestrian
enhancement |
182,100 |
175,200 |
6,900 |
| 2.9 |
Farmer's Market |
no estimate |
|
|
|
Priority 2 estimated total
project cost |
$2,049,470 |
$1,951,460 |
$98,010 |
| Priority 3 |
|
|
|
|
| 3.1 |
Library Park improvements |
40,000 |
0 |
40,000 |
| 3.2 |
Alley pedestrian
enhancements |
no estimate |
|
|
| 3.3 |
South Hill 95 to three
lanes, Tamarack to S. City |
774,100 |
584,300 |
189,800 |
| 3.4 |
Cultural Center |
1,742,730 |
1,742,730 |
0 |
|
Priority 3 estimated total
project cost |
$2,556,830 |
$2,327,030 |
229,800 |
|
GRAND TOTAL ESTIMATED CAPITAL
PROJECT COST: |
$8,889,836 |
$8,161,926 |
$727,910 |
|
|
B. Annual Operating
Expenses Will Support a Wide Variety of Actions
The
five-year operating plan presented in Chapter 4 will require the
following annual budgets:
Year
1: $112,700
Year
2: 238,300
Year
3: 185,250
Year
4: 156,450
Year
5: 149,950
TOTAL
$842,650
The
spike in the second year reflects several feasibility studies that will
be needed to attract grants and other forms of investments for key
projects. Considering that this budget will address ten different
program areas, the figures are very reasonable. Fully 35%, or
about $300,000, is focused on promotion. Much of this can come from
reorganized spending that is already being committed by the business
community. In fact, most of the recommended operating expenses can be
covered from readily available resources.
| Description |
2001 |
2002 |
2003 |
2003 |
2004 |
2005 |
Sources of Support |
| A. Organizational Development |
|
|
|
|
|
|
|
| Hire professional manager to lead
implementation (Cost includes operating expense) |
85,500 |
85,500 |
85,500 |
85,500 |
85,500 |
85,500 |
IDOC, City, County, KTI |
| Create a Cultural Center Nonprofit
Corporation |
1,000 |
|
|
|
|
|
BCM, KTI, Clubs |
| Create a Main Street program for
downtown revitalization (led by professional manager) |
500 |
500 |
500 |
500 |
500 |
500 |
BCM, CC |
| Attend Annual National Main Street
town meeting |
|
1,200 |
1,200 |
1,200 |
1,200 |
1,200 |
|
| B. Industrial Development |
|
|
|
|
|
|
|
| Conduct feasibility study for
incubator |
|
25,000 |
|
|
|
|
BCM, UI, PAC, EDA |
| Conduct workshops on development
opportunities |
500 |
500 |
500 |
500 |
500 |
500 |
BCM, PAC, UI |
| Conduct feasibility studies for
wind, biomass, solar energy |
|
40,000 |
20,000 |
|
|
|
EDA, RC&D, UI |
| Create business plan for permanent
Farmer's Market |
|
20,000 |
|
|
|
|
BCM, PAC, UI, IDOC |
| C. Tourism Development:
Capture/Retain Visitors |
|
|
|
|
|
|
|
| Enhance Entrances, north, south,
Highway 2, town |
|
|
|
|
|
|
|
| Highway
signs (one refurbished, one new) |
1,000 |
5,000 |
|
|
|
|
Gem, CC, City |
|
Signs/Billboards (Highway 95 & 2) or tourist radio
information |
|
|
6,000 |
6,000 |
6,000 |
6,000 |
ITC, Biz |
| Link casino/hotels to local
businesses, attractions (two signs to pedestrian underpass from
downtown, casino) |
|
1,000 |
|
|
|
|
City, ITD, casino |
| Cater to international guests
(business signs, brochures) |
|
500 |
2,000 |
1,000 |
1,000 |
1,000 |
Biz, ITC |
| Investigate shuttle options,
feasibility analysis, business plan |
|
8,000 |
|
|
|
|
EDA, KTI, ITD |
| D. Downtown Revitalization |
|
|
|
|
|
|
|
| Retain and Expand Existing
Businesses Provide business technical
assistance |
|
|
|
|
|
|
|
| Workshops:
markets/marketing, merchandising, service |
5,000 |
1,000 |
1,000 |
1,000 |
1,000 |
1,000 |
SBDC, Biz, CC, USDA |
| Design
assistance for facade, building renovations |
|
1,000 |
1,000 |
1,000 |
1,000 |
1,000 |
UI, Gem, HPC, Biz |
| Create a
low-interest loan pool |
|
500 |
|
|
|
|
Banks, Biz |
| Recruit Complementary
Retail/Service Businesses |
|
|
|
|
|
|
|
| Create
inventory of commercial space forms (forms, 3-ring binder) |
50 |
|
|
|
|
|
CC, Biz, Realtors |
| Create a
business recruitment package (folders, copying) |
|
500 |
50 |
50 |
50 |
50 |
CC, Biz, Gem |
| Pursue
deal: make contacts, follow up (expenses) |
|
500 |
500 |
500 |
500 |
500 |
CC, Biz, Gem |
| Support
physician recruitment (receptions, etc.) |
|
500 |
500 |
|
|
|
Biz, CC, BCH |
| Support
school facility improvements (2,000 fliers) |
|
250 |
|
|
|
|
CC, Biz |
| Create Cohesive Business
"District" Downtown |
|
|
|
|
|
|
|
| Highlight
heritage of downtown and community |
|
|
|
|
|
|
|
| Walking
tour brochures, 5M copies per year |
|
900 |
750 |
800 |
800 |
800 |
ITC, HPC, Biz |
|
Interpretive signs/plaques for historic buildings |
|
|
2,000 |
2,000 |
2,000 |
2,000 |
HPC, Biz, Gem |
|
South
Hill Development
South
Hill Development Strategy |
|
|
|
|
|
|
|
| Initiate voluntary sign guidelines,
workshops for businesses |
|
500 |
|
500 |
|
|
CC, City, Biz |
|
Promotion
Organize
for Promotion |
|
|
|
|
|
|
|
| Develop promotion image, or
"brand" w/DT Option |
1,500 |
|
|
|
|
|
ITC, CC |
| Meet with ad agency, develop action
plan, budget |
2,500 |
1,200 |
|
|
|
|
Biz, CC |
| Obtain support from businesses,
organizations |
|
|
|
|
|
|
|
| Promotion
plan and budget copies for businesses |
250 |
250 |
250 |
250 |
250 |
250 |
CC |
| Quarterly
mailings to businesses re status/results |
500 |
1,000 |
1,000 |
1,000 |
1,000 |
1,000 |
CC |
| Promote to Local Residents |
|
|
|
|
|
|
|
| Create, distribute awareness
brochure, follow-up bulletins |
2,000 |
550 |
550 |
550 |
550 |
550 |
City, ED, Biz |
| Develop 3-rack brochures for local
goods and services |
1,800 |
1,000 |
1,000 |
1,000 |
1,000 |
1,000 |
CC, Biz, ITC |
| Promote the Community Brand |
|
|
|
|
|
|
|
| Newspaper
ads (2 months times 2 papers) |
4,200 |
8,000 |
12,500 |
12,500 |
15,000 |
15,000 |
CC, Biz, ITC |
| Radio
ads (6 x daily, :30 seconds, 4 days per week) |
2,300 |
7,500 |
7,500 |
7,500 |
7,500 |
7,500 |
CC, Biz, ITC |
| Shopping
bags with brand and list of stores |
|
5,000 |
5,000 |
5,000 |
5,000 |
5,000 |
Biz |
| Giveaway
items for special promotions |
|
500 |
1,000 |
1,000 |
1,000 |
1,000 |
CC, Biz |
| Seasonal/event
banners for downtown, South Hill (50 per year) |
|
2,500 |
2,500 |
2,500 |
2,500 |
2,500 |
CC, Biz |
| Business
directory signs (2 updates) |
|
|
5,000 |
500 |
500 |
500 |
CC, Biz |
| Create theme promos/events (decor,
supplies, prizes) |
1,000 |
3,000 |
5,000 |
5,000 |
5,000 |
5,000 |
CC, Biz, ITC |
| Enhance web site to promote local
businesses |
500 |
1,200 |
1,200 |
1,200 |
1,200 |
1,200 |
CC, ITC |
| Encourage cross promotions (family
tour) |
500 |
500 |
500 |
500 |
500 |
500 |
CC, Biz |
| Encourage citizen participation -
brick/adoption promo |
|
500 |
500 |
500 |
|
|
CC, City |
| Promote to Resident Regional
Markets |
|
|
|
|
|
|
|
| Link to regional promo (eg.,
Selkirk Loop - 50K brochures) |
|
4,000 |
4,000 |
4,000 |
4,000 |
4,000 |
ITC |
| Target regional residents for major
retail events |
1,000 |
2,000 |
2,000 |
3,000 |
3,000 |
3,000 |
ITC, Biz |
| Promote Tourist Markets |
|
|
|
|
|
|
|
| Assist potential visitors during
day trip planning |
|
|
|
|
|
|
|
| Visitor
Guide to Boundary County reprint |
|
|
12,000 |
|
|
12,000 |
ITC, NITA |
| Media
kits (100) folder and contents |
|
|
500 |
100 |
100 |
100 |
ITC, NITA |
| Follow-up with mailings and E-mails
after stay |
|
|
|
|
|
|
|
| Post
cards (5K) and postage (@ $.25) |
500 |
1,500 |
1,500 |
1,500 |
1,500 |
1,500 |
ITC, Biz |
| Track and Evaluate Results of
Promotion Program |
|
|
|
|
|
|
|
| Decide on tracking methods,
establish benchmarks |
250 |
|
|
|
|
|
CC, Biz, Ed |
| Set up tracking and reporting
logistics |
150 |
|
|
|
|
|
CC, Biz, Ed |
| Conduct consumer survey (w/college,
research firm) |
|
5,000 |
|
8,000 |
|
|
Ed, CC, Gem |
| Evaluate promotion efforts and
adjust (agency assist) |
700 |
750 |
750 |
800 |
800 |
850 |
CC, Biz, Ed |
|
Totals |
$112,700 |
$238,300 |
$185,250 |
$156,450 |
$149,950 |
$74,250 |
|
|